Maritime - North Star • Service Operation Vessel • Voith eVSP
North Star faced a critical challenge with the new hybrid propulsion system in their Service Operation Vessels (SOVs), including the Grampian Tyne, Derwent, and Tees, powered by Voith's innovative eVSP. As early adopters of this technology, they encountered a significant issue when Jungle's Canopy monitoring algorithms detected a fault in the eVSP system of Grampian Tyne, identifying a drop in oil pressure that traditional maintenance methods may have missed.

Figure 1 - IAS alarm for control oil pressure is set to 25 bars (yellow line). While the Main Propulsion was operating, this pressure never reached an alarming threshold for a longer period of time. Canopy triggered alarms based on this pressure since July 4th, by leveraging automated algorithms comparing real sensor output with expected normal output.
Upon investigation, it was discovered that two small non-critical seals that protect a void space within the propulsion unit had started to degrade due to incompatibility with a specific oil additive. The partial failure was seen in the monitoring system as a pressure anomaly. North Star contacted Voith and upgraded seals were fitted in a few hours by Voith technicians at a scheduled port call. After replacing the seals with ones made from a more suitable material, the vessel's performance returned to normal. North Star is now closely monitoring the other two SOVs to prevent similar failures.
Canopy's advanced detection system played a pivotal role, leveraging automated algorithms that continuously monitor vessel data. Canopy flagged the issue well before it could escalate, enabling a proactive intervention by North Star.

Figure 2 - Damaged shaft seal
The issue was fixed during crew change on the 24/25th of July, and resolved on July 26th, when Grampian Tyne returned to full operation, with oil pressures returning to normality.
July 4th
First trace of low oil pressure detected in Main Propulsion 1 by Canopy
July 8th
Onboard crew contacts the OEM support regarding the issue
July 24th - 25th
Crew change and seals replacement
July 26th
Grampian Tyne returns to operation. Oil pressure is restored and back to normal
The financial implications of this proactive approach were substantial. Canopy's early detection system allowed North Star to plan maintenance efficiently, safeguarding operational continuity and minimising financial risk.